GEELYE connects production checks with clearly scoped documentation so buyers can review what was inspected, which component a public file covers and what still requires destination-specific confirmation.
01
Quality gate 01
Material and component review against the approved scope
The quality process begins with the selected model and approved project requirements. Shell sections, interior components, electrical items, finishes and accessories need to correspond with the configuration the buyer has reviewed.
Model and order reference check
Shell and interior component review
Finish and accessory confirmation
Separation of standard and customized items
02
Quality gate 02
Assembly and visible-condition checks during production
Checks during handling and assembly help identify visible issues before products move further through the workflow. The applicable checkpoints depend on the model and approved customization rather than a single universal checklist for every order.
Component matching during assembly
Visible surface and fit review
Configuration comparison against the order
Recording of items that require correction
03
Quality gate 03
Electrical and functional review before packing
Where included in the approved model, electrical controls, lighting, ventilation and specified accessories are reviewed before packing. Test scope and records should be requested against the actual ordered configuration.
Electrical configuration confirmation
Lighting and control checks where specified
Ventilation and accessory checks where specified
Issue follow-up before shipment preparation
04
Documentation scope
Match every compliance file to its component, model and destination
The public CE EMC, FCC sDoC and RoHS files shown below identify a control-board scope. They should not be interpreted as blanket whole-pod certification. Final requirements depend on the ordered model, electrical configuration, installation context and destination market.
Confirm the named product or component
Check the report or declaration type
Compare the document with the ordered configuration
Verify destination-specific requirements before purchase
Public document previews
Compliance evidence with an explicit control-board scope
These files are provided for preliminary procurement review. Contact GEELYE to confirm whether a document applies to the selected product configuration and destination market.
01
CE EMC
Electromagnetic compatibility documentation for the control-board scope identified in the public report.
Are the public CE EMC, FCC and RoHS documents whole-pod certificates?
No. The public files shown on this page identify a control-board scope. They must not be treated as blanket whole-pod certification.
02
How can a buyer confirm compliance for a destination market?
Provide the destination, selected model, electrical configuration and project context. The required documents and any additional local compliance work can then be reviewed against that scope.
03
What quality information can be discussed for an order?
Buyers can request information relevant to the approved model, including configuration checks, functional review points, packing verification and available supporting documents.
04
Does a public document guarantee approval for every customized model?
No. Customization can change the configuration and applicable requirements. Document relevance must be checked against the final ordered specification.
Document review
Need to confirm quality or compliance evidence for your project?
Send the selected model, electrical configuration, quantity and destination market. GEELYE can identify the available documents and points that still require confirmation.