Send Airport Brief
Commercial application solution · Airports

Airport Sleep Pods for Passenger Rest

Plan airport sleeping pods around passenger flow, privacy, cleaning, luggage and terminal services, then compare GY98 premium capsules with GY80 standalone rest pods.

Submit the airport brief to unlock the project requirements checklist PDF and request a tailored review.

Xi'an Airport T5 Capsule Hotel · Airports project reference

Direct answer

How should airport sleep pods be selected?

Commercial airport sleep pods should be selected according to passenger dwell time, terminal or lounge location, available floor area, booking and cleaning workflow, luggage, privacy, electrical and ventilation interfaces, delivery access and airport approval requirements—not appearance alone. Searches for airplane pods or transit pods usually describe rest pods inside terminals, lounges or airport hotels, not sleeping cabins onboard an aircraft. GY98 suits premium sleeping zones; GY80 suits a larger standalone rest or wellness format.

Airport project fit

What should an airport buyer prepare before a project review?

01

Suitable for

Airport operators, lounge operators, airport-hotel teams and appointed consultants planning a defined passenger rest zone.

02

What to submit

Planned zone and landside or airside status, dimensioned plan or available area and ceiling height, service model, operating and cleaning needs, destination and project stage.

03

What GEELYE returns

A project-specific review of the GY98 or GY80 direction, layout inputs, configuration questions, supply boundaries and items requiring local or written confirmation.

100 m² airport space planning

A reviewable 100 m² concept—not a fixed pod-count claim

This planning module converts one stated area into an operating-space allocation and two product scenarios. It uses a 10 m × 10 m clear rectangular room only as a working geometry; a measured plan remains required.

100

Planning basis

  • Gross internal area: 100 m²
  • Working geometry: 10 m × 10 m clear rectangle
  • Location, columns, exits, doors and ceiling restrictions: not yet supplied
  • Local airport, fire, accessibility and MEP review: required

Working area allocation

The allocation totals exactly 100 m². It reserves operating and support space before any concept quantity is shown.

  1. Pod planning zone40
  2. Passenger circulation and accessibility coordination28
  3. Reception and waiting14
  4. Luggage storage8
  5. Cleaning and linen6
  6. Utilities and service4

Two concept arrangements for the 40 m² pod-planning zone

Both arrangements use published product footprints. The central aisle and two-bank diagrams are schematic and must be redrawn against the measured room.

GY986 double-deck sets · 12 individual sleeping places

Premium sleep-zone direction

Published SC982-A double-deck set: 2.194 × 1.675 m

Three double-deck sets per bank face a central operating aisle. The concept prioritizes a premium sleeping format while retaining the shared support-space allocation.

Ceiling, ladder clearance, egress, accessibility and exact entrance orientation remain unapproved.

Review product direction
GY808 standalone units · 8 individual rest places

Standalone rest-zone direction

Published M801-A unit: 2.300 × 1.148 m

Four standalone units per bank face a central operating aisle. The concept keeps every unit on the floor and avoids an unsupported stacked GY80 arrangement.

Door selection, user format, luggage, accessibility, service access and exact clearances remain unapproved.

Review product direction

What can change the concept quantity

  • Actual room proportions and structural columns
  • Number, position and direction of exits and doors
  • Accessible route and any accessible rest provision
  • Reception, queue, luggage and housekeeping operating model
  • Terminal fire strategy, HVAC, electrical distribution and security controls
  • Selected variant, entrance direction, maintenance clearance and local approval

Have the 100 m² drawing?

Submit the measured length, width, ceiling, columns, doors, exits and available utility points with the airport brief.

Send the 100 m² plan for review
01

Customer challenge

What must an airport sleep-pod zone solve?

Airport sleep facilities must offer privacy and comfort while fitting strict footprints, operating schedules and technical coordination requirements.

  • 01

    Convert underused terminal space into a premium rest service

  • 02

    Protect passenger privacy in a busy public environment

  • 03

    Coordinate power, ventilation, cleaning access and operating flow

02

GEELYE solution

How should the pod zone and passenger journey be planned together?

GEELYE premium capsule options give airport operators and lounge partners a defined sleep environment that can be planned as a modular zone.

  • 01

    Premium capsule formats for passenger-facing locations

  • 02

    Configurable interior functions and finishes

  • 03

    Model review based on dwell time, service level and available footprint

04

Airport buyer decision table

What belongs in an airport sleep-pod project brief?

Separate the service model, buyer inputs, local airport approvals and supplier scope before selecting a model or pod count.

Decision pointProject guidanceConfirmed by
Suitable projectsTerminal, lounge or airport-hotel rest zones with a defined location, passenger service and operating workflow.Airport buyer and operator
Not suitable yetA proposed area without a dimensioned plan, passenger journey, cleaning model or airport approval route is not ready for a final quantity.Buyer and airport project team
Buyer informationLandside/airside/lounges, dwell time, demand, floor plan, ceiling height, luggage, booking, cleaning, operating hours, quantity and schedule.Buyer or appointed operator
Local confirmationPassenger flow, egress, accessibility, fire, security, electrical, ventilation, sanitation, terminal interfaces and airport approvals.Airport consultants or authority
Products and evidenceGY98 premium sleep capsules and GY80 standalone rest pods; project records prove only the facts explicitly documented.GEELYE and buyer

Have a zone, stage or target format in mind?

Send the information already available. Unknown optional details can be added later during the project review.

Send Airport Brief
05

Airport product selection

GY98 or GY80: choose airport sleeping pods by service model

Both are single-guest horizontal pod series, but they solve different airport planning briefs. Compare the guest experience, enclosure format, entrance, layout and fit-out before requesting a model schedule.

GY98Premium passenger sleep capsuleGY80Standalone rest or wellness enclosure
Best-fit airport zonePremium passenger rest service, lounge or airport-hotel sleeping zone.Independent rest, recliner or wellness zone needing a larger self-contained enclosure.
Product formatPremium conventional sleep capsule with upgraded cabin equipment and a passenger-facing exterior.Standalone horizontal box enclosure with a configurable interior rather than a conventional capsule-bed stack.
Entrance choiceHalf-open or two-thirds-open smart-door concepts, depending on the selected GY982 or GY983 variant.GY801-A open entrance; GY802-A and GY803-A add the confirmed safety sliding-door package.
Layout planningCoordinate horizontal pod layout, deck count, aisle clearance and door travel with terminal operations.Plan as a standalone floor unit; no vertical or stacked GY80 layout is listed. Confirm delivery route and entrance clearance.
Interior directionBuilt around passenger sleeping, privacy and a premium cabin presentation.Can be reviewed for a recliner, massage chair or wellness seat when furniture dimensions and utilities are supplied.
GY98

Choose GY98 for a premium sleeping service

Start with GY98 when the airport brief prioritizes a recognizable sleep capsule, premium passenger presentation and a repeatable sleeping-zone layout.

View series
GY80

Choose GY80 for an independent rest format

Start with GY80 when the project needs a larger standalone enclosure, flexible interior planning or a rest and wellness use beyond a conventional capsule bed.

View series

Need an airport-specific GY98 or GY80 recommendation?

Send the terminal or lounge location, room dimensions, passenger service model, estimated quantity and destination requirements for a project review.

Send Airport Brief

Airport planning resource

Compare GY80 and GY81 airport pod options

Download the three-page product matrix to review models, approximate dimensions, planning directions and airport project confirmation items.

English PDF · 3 pagesDownload airport product matrix

Airport commercial planning

Model an airport rest-zone operating scenario

Request the Airport ROI Calculator to enter buyer-supplied pricing, operating hours, utilization, average stay, cleaning turnaround and operating costs.

  • Pricing and opening hours
  • Utilization and average stay
  • Cleaning turnaround
  • Operating-cost assumptions
Request Airport ROI CalculatorAvailable after you submit the airport brief. Results are planning scenarios, not revenue or payback guarantees.

Commercial terms

Confirmed Ordering & Delivery Terms

Use these published terms as the starting point for a GEELYE quotation. The selected model, configuration, named port and final order scope are confirmed in the quotation.

Review Certification Scope Published material and component documents do not certify the complete pod.
MOQ
1 set
Trade term
FOB
Sample lead time
15 days
Bulk lead time
15–30 days
Sample
Sample fee required
Packaging
Paper-based packaging
Installation
Customer installation · video provided

What the published terms include—and what the project must arrange

Use these boundaries to compare quotations consistently. The named port, selected configuration and any additional services must be written into the quotation or contract.

01

Sample and packaging

A sample is chargeable with a published 15-day lead time. Paper-based packaging is used; carton count, packed size and weight follow the confirmed configuration.

02

FOB shipping boundary

The quotation confirms the named FOB port. Main freight, import clearance, duties, destination delivery and site unloading are outside the published base scope unless separately agreed in writing.

03

Installation and site boundary

The customer installs the units; GEELYE provides an installation video. The buyer or local contractor coordinates unloading, internal movement, site connections, safety, testing and local approvals.

Include with your inquiryProduct type or series, estimated quantity, destination or named port, room dimensions or plan, required configuration and target schedule.

Request a Product Quotation
06

Airport project pack

Turn the airport brief into a reviewable project package

Submit the site and operating inputs needed to prepare a configuration review. Each section separates published product facts, buyer inputs, local approvals and items that require written confirmation.

Step 1 · Contact and project needRequired to send the brief
Step 2 · Project basicsOptional — add what you know
Step 3 · Site and operating detailsOptional — expand for a more focused review

Have a dimensioned plan or tender file? Submit the brief first. GEELYE will provide the appropriate project-document channel during follow-up.

* Required

By submitting this form, you agree that GEELYE may use these details to respond to your project inquiry. GEELYE.

Contact via WhatsApp
Have drawings or requirement files?

Email CAD, PDF, floor plans, photos or specifications. Include the project country and estimated quantity.

Send attachments to sales@geelye.com

What the airport project review can cover

01

Product configuration schedule

Shortlist GY98 or GY80 directions from published model data; confirm variant, quantity, finish and interfaces after review.

02

Space-planning input sheet

Record usable area, ceiling height, columns, exits, accessibility, luggage, reception, cleaning access and utilities before fixing capacity.

03

Installation coordination matrix

Separate factory supply, local works, delivery access, electrical, ventilation, testing and airport approval responsibilities.

04

Cleaning and maintenance brief

Document turnover workflow, consumables, access, inspection and maintenance requirements for the operator and selected configuration.

05

Spare-parts review

Prepare the parts list, recommended quantities, availability and delivery terms only after the final configuration is confirmed.

06

Remote-management interface brief

Record booking, payment, locks, status, cleaning and reporting needs; available systems and integration ownership are confirmed separately.

07

Operator scenario worksheet

Model buyer-supplied pricing, utilization, hours and operating costs. Results are planning scenarios, not revenue or payback guarantees.

Airport layout planning

Compare privacy layers before fixing airport pod capacity

Use the sleep pod layout comparison to review how open, double-partition and private anteroom concepts affect density, ventilation, wiring and installation coordination.

Open the layout comparison
07

Project cases

What airport project evidence is currently published?

Only references with an explicit Case Database association to this application are shown.

Xi'an Airport T5 Capsule Hotel · source-backed project reference
Xi'an Airport T5

Xi'an Airport T5 Capsule Hotel

Supplied project media documents capsule units in the named environment. Product model, quantity and operating results remain unconfirmed.

Review project evidence
Baiyun Airport Hotel · source-backed project reference
Baiyun Airport

Baiyun Airport Hotel

Supplied project media documents capsule units in the named environment. Product model, quantity and operating results remain unconfirmed.

Review project evidence

Reference names, locations and media are source-backed. Product model, quantity, date and project outcome are not stated where the supplied records do not confirm them.

View all project references
08

Verifiable product facts

Which airport-pod specifications can buyers verify?

Values below come from named GEELYE product records and do not replace airport-specific submittals, consultant review or an approved layout.

ItemPublished valueSource or boundary
GY98 exampleSC982-A — horizontal L2194 × W1442 × H1480 mm; double-deck with ladder L2194 × W1675 × H2470 mmSC982-A record
GY80 exampleM801-A — standalone horizontal unit L2300 × W1148 × H1747 mmM801-A record
Layout boundarySC982-A: single-unit or double-deck; M801-A: standalone floor unit; no vertical or stacked GY80 layout is publishedNamed product records
MaterialsSC982-A / M801-A: ABS (General; optional V2 or V0 flame-retardant) + steel structureGrade and finish confirmed per order
Electrical110–240 V input; 12 V lighting; approximately 60 W without TV or 110 W with TVProduct load; airport connection locally designed
VentilationNamed records publish adjustable circulation and approximately 30 m³/h fresh-air exchangePod value; terminal air system locally coordinated

Before production, confirm model schedule, orientation, deck arrangement, doors, clearances, luggage and cleaning access, utilities, delivery route, security constraints and approved documents.

09

Airport procurement questions

What must be confirmed before quotation and production?

Complete answers for the highest-intent airport sleep-pod planning questions.

How many sleep pods fit in an airport zone?

There is no reliable fixed number without a dimensioned plan. Provide usable area, ceiling height, columns, exits, passenger circulation, accessibility, luggage, reception, cleaning access, utilities and the selected model footprint.

What information is needed for an airport sleep-pod quotation?

Provide airport and zone location, landside or airside status, dimensioned plan, passenger and dwell-time assumptions, service model, preferred GY98 or GY80 direction, target quantity, operating hours, utilities, delivery boundary and schedule.

Which sleep pod format fits an airport?

GY98 is the initial direction for a premium passenger sleeping zone or airport-hotel setting. GY80 is the alternative for a larger standalone rest, recliner or wellness enclosure. Final selection follows the measured plan and operating model.

What must the airport team confirm before production?

Confirm model and quantity, orientation, deck arrangement, entrance treatment, finishes, material grade, power and ventilation interfaces, approved layout, fire and security requirements, packaging, delivery route and required documents.

Do the airport references prove installed models or operating results?

No. Published records support the stated project names, locations and approved media. They do not confirm exact models, quantities, dates, opening status, occupancy, revenue or performance results unless separately documented.

Are airplane pods and transit pods the same as airport sleep pods?

These searches usually refer to passenger rest pods located inside terminals, lounges or airport hotels. They do not mean onboard aircraft sleeping cabins. For procurement, define the landside, airside, lounge or hotel location, passenger dwell time and operating workflow.

Need an airport-specific GY98 or GY80 recommendation?

Submit the airport brief to unlock the project requirements checklist PDF and request a tailored review.

Request airport project pack
Explore applications

Compare all six commercial sleep-space applications

Move between operating environments to compare planning priorities, recommended products and source-backed project references.

View all applications

Planning a Commercial Capsule Bed or Sleep Pod Project?

Share your application, estimated quantity, room dimensions and destination. We will help identify relevant product formats and the next practical step.

Send Your Project RequirementsView products
Product inquiry

Get a Quote

Share your contact details and purchasing requirements. The selected product and page context are included automatically.

By submitting, you agree that GEELYE may use these details to respond to your inquiry. Privacy

WhatsApp